Presentation

CMMC

Centre Medical Maman Clementine

Service Médical et œuvres d’assistance sociale pour le développement de la République démocratique du Congo au Nord Kivu.

 

 

 

PRESENTATION

The CMMC is a primary and secondary health care center, preventive, curative and promotional, working in the Democratic Republic of Congo, province of North Kivu, commune of Karisimbi City of Goma.

Le Centre Médical Maman Clémentine en sigle CMMC est un Centre des soins de santé primaire et secondaire, préventive, curative et promotionnel, œuvrant en République démocratique du Congo, province du Nord Kivu, Commune de Karisimbi, Quartien Kasika, Avenue Ndara Nr.2

The health and well-being of the population will remain our priority. In other words, our sick, malnourished and psycho-traumatic are treated with all means including professional conscience taking into account all aspects, diagnosis, monitoring and treatment of our patients, pregnant women, injured, with actions prevention and health education.

La santé et le bien-être de la population restera notre priorité. Autrement dit, nos malades les malnutris et la psycho traumatiques sont traités avec tous les moyens surtout la conscience professionnelle en tenant compte des tous les aspects, le diagnostic, la surveillance et le traitement des malades, des blessés et des femmes enceintes des actions de prévention et d’éducation à la santé.

The CMMC consists of two buildings constructed with sustainable materials. The buildings have two levels comprising: the ground floor and the first floor. Between the 2 buildings there is a 3.5 m high footbridge connecting the two buildings and which facilitates passage through the two buildings. The structure contains 4 balconies or veranda for exclusive use and 4 corridors. The buildings have 30 functional rooms of acceptable dimensions and well-lit.

HYGIENIC CONDITIONS

Existence of measures having an impact on the quality of care, in particular:

-10 Latrines including 3 External; 6 showers including 2 internal

The structure is powered by the electric current from the hydroelectric power station and reinforced with 3 panels of 1200 WAT and a backup generator of 6 KVA. Power is available 24 hours a day.